Installation of Concrete Pavers


Installation Guide

  1. Planning the project
  2. Underground investigations
  3. Excavation
  4. Base installation
  5. Edge Restraint installation
  6. Screening the Bedding Sand
  7. Layering Pavers
  8. Cutting Pavers
  9. Compacting & Setting
  10. Finishing

Step 1. Planning

Begin the planning process by drawing a diagram of the area you want to pave, noting any existing structures such as buildings, fences and other paved areas. Your local paver supplier or dealer can help you determine the best stones and the proper amount of supplies you need.

Step 2. Underground investigations

Contact your local utility companies before you begin excavation to ensure you are aware of the location of any underground utilities, so that you are safe from injury and to prevent damage to any underground utilities.

Step 3. Excavation

Stake out an area approximately 12 inches larger than the area to be paved. Plan to slope the paving deck away from the buildings in the direction of normal drainage. Make sure that you have 90º corners at your starting point. You can do this by using the 3-4-5 triangle method. From the corner stake measure 3 foot across the base and 4 foot up the side. The diagonal line joining these two points should be 5 foot. If it is not, adjust the 4 foot side until the diagonal is exactly 5 foot.

For light pedestrian traffic, a base of between 4 inches and 6 inches of processed gravel is recommended. To achieve this, excavate between 7 inches and 9 inches deep to allow for base material, sand and block pavers.

For heavy vehicular traffic or around pools a base of between 6 inches and 8 inches of processed gravel is recommended. To achieve this, excavate about 9”-11” deep. Remember to excavate 12” beyond the area you plan to pave.

Step 4 . Base installation

For large paved areas compact the surface of the excavated soil with a plate compactor (you can rent these). In smaller paved areas a hand tamper may be sufficient. Fill the area with 3/4” minus crushed stone or aggregate approximately 5” thick. Compact this with the plate compactor. Wetting the gravel lightly with water will help with the compacting. When you can walk on the gravel without causing an indentation you can add the next layer of gravel and compact it. Continue to add gravel in layers until the base is approximately 3” to 3-1/2” from the desired level of the finished grade.

Make sure to provide a slope to the surface in order to allow for water drainage. The slope should be 1/8” per foot. Install a level line across the area using a line level. On the stake that is at the end you want to slope towards, move the line down 1/8” for every foot of pavement. For example, if your paving will be 8’ long, move the string down 1”. Measure the distance from the line to the base. The distance should be equal all along the line. For example, if your paving will be 8’ long, move the string down 1”. Measure the distance from the line to the base. The distance should be equal all along the line.

Step 5. Edge Restraint installation

The purpose of edge restraints is to provide a solid barrier to prevent the pavers from rolling or spreading. They should always be used. You can use PVC, aluminum, concrete or pressure-treated wood. Precast concrete curbs are recommended because they are easy to install, are very durable and will accent your paving stone. Use the 3-4-5 triangle method to make sure that all corners are exactly 90º.

Step 6. Screening the Bedding Sand

Before you can lay the pavers, a bed of sand must be prepared. Use 1” outside diameter galvanized electrical conduit, strips of wood or other suitable material, such as screed rails, and place them 6’ to 8’ apart down the area to be paved. Measure the distance from the string lines and the screed rails at several points. If necessary, adjust the height of the rails by putting sand under them or trimming the base underneath if too high. Hand pack bedding sand around the rails to hold them in place. Spread 1” of sand between the rails until it is slightly higher than the rails. Use a 2” x 4” board to drag across the top to smooth and level the surface. Fill in the low spots and repeat. Remove the rails and fill in the indentations with sand, and trowel smooth as you are laying the pavers. Do not step on, compact or wet the sand after you have finished screening.

Step 7. Layering Pavers

Starting in a 90º corner, lay the interlocking pavers in the pattern you have chosen. Work outwards keeping all joint lines straight. Use string lines pulled along joint lines and parallel to the edge restraints or, chalk lines snapped on the surface of the sand bed to keep the joint lines straight. Leave a 1/8” space between pavers.

Periodically check the alignment of the rows by stringing a line along the front edge of the leading row. Each paver should touch the string. If adjustment is needed use a screwdriver and hammer to move it into place. Work off the pavers you have already installed but stay away from the edge so you do not disturb the sand bed. Install remaining edge restraints. Do not try to turn the pavers with curves in your laying pattern. Cut pavers to fit along the edge restraints.

Step 8. Cutting Pavers

Measure and mark the pavers to be cut with a marking crayon. A diamond blade wet saw, paver splitter or a hammer and chisel can be used to cut pavers. Always wear safety glasses. If possible, keep edge stones to one half paver.

Step 9. Compacting & Setting

Sweep the surface with a brush to remove any debris. Spread masonry sand over the surface, sweeping it into the joints leaving surplus sand on the pavers. Tamp the pavers down using the plate compactor. The excess sand on the pavers will cushion the surface and the vibration will assist in filling the joints. Spread more masonry sand if required. Make two or three passes at 90º to each other and re-sweep the surface.

Step 10. Finishing

Sweep the remaining excess dry sand over the
surface filling the joints. You will have to repeat this over the next few days as the sand settles and the rain compacts it.

Tile Tech Pavers home page

Paver Pedestal System:
 Paver Pedestal Introduction
 Paver Pedestal Advantages
 Paver Pedestal Application
 Paver Pedestal Installation

Concrete Pavers:
 History of Pavers

 Advantages of Pavers
  Paver Price & Cost Comparison
  Paver Appearance Comparison
  Paver Maintenance Comparison
  Paver Maintenance Cost
  Paver Material Advantages
  Utility Repairs Advantages
  Paver Weather Comparison
  Paver Snow Advantages

 Designing with Pavers
    Patterns of Pavers
    Shapes of Pavers
    Colors of Pavers
    Thickness of Pavers

 Styles of Pavers
  Architectural Pavers
  Interlocking Pavers
  Interlocking Pavers Introduction
  Interlocking Pavers Advantages
  Interlocking Pavers Application
  Interlocking Pavers Manufactur
  Interlocking Pavers Installation

  Precast Concrete Pavers
    Precast Pavers Introduction
    Precast Pavers Advantages

  Paving Slab Pavers
  Paving Stone Pavers
  Stepping Stone Pavers
  Exposed Aggregate Pavers
  Stamped Concrete Pavers

 Application of Pavers
  Patio Paver
  Patio Paver Introduction
  Patio Paver Advantages

  Walkway Pavers
  Walkway Pavers Introduction
  Walkway Pavers Installation

  Driveway Pavers
  Driveway Pavers Introduction
  Driveway Pavers Materials
  Driveway Pavers Maintenance
  Driveway Pavers Installation

  Sidewalk Pavers
  Roof Deck Pavers

  Pool Deck Pavers
  Pool Deck Pavers Introduction
  Pool Deck Pavers Benefits

Installation of Pavers:
 Installation of Pavers1
 Installation of Pavers2
 Pavers Installation

 Paver Maintenance:
 Cleaning Pavers
 Sealing Pavers
 Repairing Pavers

 Paver Accessories:
 Stair Treads & Risers
 ADA Truncated Domes
 Detectable Warning Pavers
 Paver Hand Tools
 Paver Power Tools

 Other Resources
 Links



About Us  |   Contact Us  |   Catalog Request  |   Quote Request  |   Download Center  |   Resources  |   Links